- 重点词汇
- 相关例句
Responsible for obtaining design input from Project Manager as appropriate.
在适当的时候向项目经理处获得设计投入.
互联网摘选
Assistant the project manager to perform preventive, routine , and emergency maintenance.
协助维护和项目经理做好维护和检修工作.
互联网摘选
In fact, smaller social welfare organizations even have difficulties writing up a project plan.
事实上, 对很多比较小的社福团体来讲,连企划怎麽写都有困难.
互联网摘选
Software size measurement is the base of effort estimation, cost estimation and project plan.
软件规模度量是估算软件项目工作量 、 成本和合理策划项目进度的基础.
互联网摘选
The projectile motion is one kind of common very important movement form.
抛体运动是一种常见的非常重要的运动形式.
网络文摘精选
The new method of measuring velocity of spinning projectile in exterior trajectory was proposed.
旋转弹外弹道自转角速度的实时测量是弹道修正引信弹道解算器设计的重要环节之一.
网络文摘精选
The radiant intensity of a special projectile is obtained at different time and observation points.
该模型实现了在不同时刻、不同观测点对目标辐射强度的计算.
网络文摘精选
In this thesis, the aerodynamic heating methods of hypersonic projectile are presented.
本论文进行了高超声速弹丸的气动热研究.
网络文摘精选
EFP warhead technology is the key technology of sense and destroy armor artillery projectile.
EFP战斗部技术是末敏弹关键技术之一.
网络文摘精选
The firing data of projectile were computed by external trajectory procedure.
通过外弹道程序,获得弹丸出炮口后的运动诸元.
网络文摘精选
