Brief Analysis of the Danjiangkou Reservoir Bank Caving of the Middle-Route Water Sources Project of South-to-North Water Transfers

  • 南水北调中线水源工程丹江口水库坍岸问题浅析
  • 来源:互联网摘选更新时间:2025-01-20 12:42:08

  • 重点词汇
  • projectn.项目,工程;(学生的)课题,研究项目;方案,计划;
  • transfersn.传输;
  • briefadj.短暂的;(衣着)短的;简洁的;简明的;
  • sourcesn.原因( source的名词复数 );[物理学]源;来源;起源;
  • bankn.银行,库;埂,堤岸;堆,排;筹码;
  • watern.水;水域;领海;困境;
  • theart.这个;指已提到或易领会到的人或事物;指独一无二的、正常的或不言而喻的人或事物;用以泛指;与形容词连用,指事物或统称的人;用于姓氏的复数形式前,指家庭或夫妇;(指特定用途的事物)足够,恰好;每,一;当前的,本,此;(重读,表示所指的为知名或重要的人或事物)
  • ofprep. 关于;属于…的;由…制成;
  • analysisn.分析,分解;梗概,要略;[数]解析;验定;
  • 相关例句
1、

The Extenics Studying on the Bank Caving Prediction of Changshou Area Along Three Gorges Reservoir

三峡库区长寿区库岸塌岸预测的可拓学研究

互联网摘选

2、

Bank Caving and Protection at Sima Bend of Jiangsu Section of Yangtze River

长江江苏河段嘶马弯道崩岸与护岸研究

互联网摘选

3、

Study on prediction method for reservoir bank caving

水库坍岸预测方法研究

互联网摘选

4、

The primary target of the monitoring is to dynamically determine the developing regularity, and heights of the" two zones"( caving zone and fractured zone) in roof rocks.

该监测的主要目的是动态测定煤层开采过程中顶板岩石两带(冒落带和裂隙带)的发展规律和高度,以指导相邻采区留设合理的防水或防砂煤柱。

互联网摘选

5、

The results show that, the overlying coal-rock mass is integrally bending and sinking, without forming any caving zone and the obvious fault zone.

结果表明,在极薄保护层钻采过程中上覆煤岩体产生整体弯曲下沉,没有冒落带和明显的断裂带。

互联网摘选

7、

Therefore, it is foundation of coal mining and design to provide accurate information of caving zone and water flowing fractured zone before and after mining.

准确地提供采煤前后顶底板岩层冒落带高度、导水裂隙带高度及其形态变化等信息,是安全采煤可行性研究和设计的基础。

互联网摘选

8、

Remining coal seam left in caving zone

浅析开采冒落带内丢煤的复采

互联网摘选

9、

The height of the watering fissures is 21.5m because the height of caving zone is about 10m after the mining of all the 3 seam ( 4 layers), and the result basically accord to the result of theoretic calculating and numerical simulation;

3煤层全采后(4个分层)垮落带高度为10m左右,导水裂隙带的高度为21.5m,与理论计算和数值模拟结果基本一致;

互联网摘选

10、

Through theoretical analysis and laboratory tests the main conclusions of research is as followed: It is effective to implement back filling technique in caving zone and breaking zone, control overburden rock mining subsidence, eliminate surface subsidence and protect the safety of the surface buildings.

通过理论分析和实验室试验,得出:实施垮落带和裂隙带注充技术可有效的控制覆岩采动下沉,消除地表沉降,保护地表建筑物、构筑物的安全。

互联网摘选

11、

The large scale Ω caving bank at the middle and lower reaches of the Yangtze River frequently threatens the safety of the flood control, and the lives and properties of the people along the both banks.

长江中下游河道大尺度的窝崩,常常危及两岸江堤的防洪安全,给人民生命财产造成较大的危害。

互联网摘选

12、

Analysis of Complex Roof Caving Process in Mining by Caving Method

崩落法开采时复杂顶板的崩落过程分析

互联网摘选

13、

Technology and control of first roof caving in coal working face

采煤工作面初次放顶的技术与管理

互联网摘选

14、

Roof caving is one of the most serious engineering disasters in underground mining activities of metal mines. It not only delays the progress of production, but also threats against underground workers.

顶板垮落是金属矿山地下开采中严重的工程灾害之一,它不仅影响采矿进度,同时也对井下作业人员生命安全构成威胁。

互联网摘选

15、

The fracture of overlying key stratum results in decrease of the roof caving angle and the increase of periodic caving span and weighting intensity.

覆岩关键层的破断使工作面顶板垮落角减小、周期垮落步距和来压强度都增大。

互联网摘选

16、

A study on ore drawing and computer-based production scheduling in block caving method

自然崩落法放矿与计算机排产方法的探讨

互联网摘选

17、

Computer method for draw control in block caving mine

崩落法放矿控制的计算机方法

互联网摘选

18、

On Ground Pressure Control Method in Block Caving

自然崩落法地压控制方法探讨

互联网摘选

19、

Two step Drawing Research on Block Caving with Floor Pillar System

有底柱阶段崩落法的两步骤放矿研究

互联网摘选

20、

These results can be used as theoretical basis for design and practice of block caving.

为自然崩落法的设计与实施提供理论依据。

互联网摘选

  • 今日热词
  • 热门搜索

简答网英语词典(dict.jiandongshicai.cn)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:(如需回复请填写联系方式)
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈