- 重点词汇
- 相关例句
The main contents: 1 The layout and design of the prefabricating girders plant in site.
论文主要内容是: 1、现场制梁场的规划设计.
互联网摘选
The ultimate load of plate girders was analyzed by spline finite strip and plastic hinge method.
摘要用样条有限条塑性铰法分析了板梁的极限荷载.
互联网摘选
The TCC group practiced TCC with a mean duration of 9.1±4.3 yrs.
太极拳组平均练拳期间为9.0±4.4年,对照组则为静态生活者.
互联网摘选
Children ages 5-6 yrs of age are greatly influenced by their experiences and their environment.
6岁的小朋友深受他们的经验及其身处环境的影响.
互联网摘选
But for the last ten yrs he has been trying to second-guess the boy child.
但在近10年里,他开始重新审视厄尔尼诺.
互联网摘选
With at least 2 yrs related working experiences, such as winding, tanking, pre-assembly, core, etc.
有2年以上相关工作经验, 如绕线 、 总装 、 预装 、 铁芯等.
互联网摘选
两个不同的线程可以互不干扰地对不同的内存位置进行读写操作.
网络文摘精选
In the design, function rooms and teaching rooms with interfering with each other.
在设计上, 功能用室和教学用室互不干扰.
网络文摘精选
