1、

Double core rubber insulated lead sheathed and armored cable

双芯橡胶绝缘铅包铠装电缆

互联网摘选

2、

The transmission speed could reach 1 Mbit/ s in a 3000 m logging armored cable.

在3000m的测井电缆上使得上传速率能够达到1Mbit/s。

互联网摘选

3、

Image signal, after compressing process, is modulated, amplified, isolated, and transmitted to the ground through 3000m single armored cable. It is, then, extracted through impedance matching and demodulating.

压缩处理后的图像信号经过调制、放大、隔离,由3000m单芯铠装电缆传输到地面,在地面进行阻抗匹配和解调提取信号。

互联网摘选

4、

Alignment Control of Cable-stayed Bridge Girder during Construction

徐州市和平路斜拉桥主梁施工线形控制

互联网摘选

5、

XLPE insulated pre-fabricated branch cable has good thermal stability and ageing resistance.

型预制分支电缆具有优良的热稳定性和抗老化性。

互联网摘选

6、

Normally, the pre-fabricated branch cable can run long term without any maintenance.

正常运行的预制分支电缆系统平时不需要任何维护保养。

互联网摘选

7、

The branch cable covers less construction area, which benefits for effectively using of the construction area.

占用建筑面积小,有利于建筑面积的有效使用。

互联网摘选

8、

The branch cable has lower demands for applying environment and installation precision.

使用环境要求低,安装精度要求低。

互联网摘选

9、

Quality Control of Preparing to Make the Branch Cable in Installment

预制分支电力电缆安装的质量控制

互联网摘选

10、

The pre-fabricated branch cable has a high first implementing rate according to the specified installation method.

预制分支电缆按规定方法安装后,一次性开通率高。

互联网摘选

11、

Application and Analysis in Prefabricated Branch Cable Engineering

预制分支电缆在工程中的应用及分析

互联网摘选

12、

Comparison of Hydrodynamic Properties Effects of Bare and Faired Cable on Towing System

流线型与圆截面型拖缆的流体动力特性对拖曳系统的影响比较

互联网摘选

13、

The National Football League has asked the FCC to direct Time Warner Cable to restore the NFL Network to the basic package on the Adelphia Communications systems Time Warner acquired this week.

国家足球联盟请求联邦通信委员会对时代华纳有线下命令,要求其履行时代华纳本周购得的Adelphia通信公司的责任,重新将NFL电视网加入到基本传输包当中。

互联网摘选

14、

Its high-tech products "Alcan Alloy Cable" had been successfully operated for over thirty years in North America.

其高科技产品加铝合金电缆在北美已经成功运营了三十多年历史,在北美的市场份额约占50%。

互联网摘选

15、

Unclip the hot film mass air flow meter cable.

松开热膜式空气质量流量计电缆。

provided by jukuu

16、

Unclip the cable from the mass air flow meter on the reservoir of the hydraulic pump and lay it aside.

松开液压泵储液罐上的空气质量流量计的电缆,放在一旁。

provided by jukuu

17、

Research on Aerodynamic Instability of Cable-dome Structure Considering Transformation of Structure

考虑索穹顶结构构形变化的空气动力失稳分析

互联网摘选

18、

Simulation of underwater acoustic measurement system cable interference voltage

水声测量系统信号线缆干扰电压的仿真计算

互联网摘选

19、

Test Research on Aerodynamic Admittance of a Long Span Cable-stayed Bridge Girder Section

大跨度斜拉桥主梁断面气动导纳试验研究

互联网摘选

20、

Brings the checking principles of ready-made branch cable, expecting to get better comprehensive economical value.

结合工程实例给出预分支电缆校验的原则,以期获得较好的综合经济价值。

互联网摘选

  • 今日热词
  • 热门搜索

简答网英语词典(dict.jiandongshicai.cn)为您提供在线翻译、英语词典、单词大全、英译汉、汉译英等英语服务!可按单词头尾、字数和词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:(如需回复请填写联系方式)
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈