1、

Experience in Online Monitoring of the Generator Unit Vibration Monitor Used in Daao Hydropower Plant

大坳水电站机组振动摆度监测仪在线监测应用心得

互联网摘选

2、

Study on the Characteristic and Key Technology of High Filled Channel Across Ravine of NLK Hydropower Station

NLK水电站工程跨沟高填方渠道特点及关键技术研究

互联网摘选

3、

Design of LHP and Its Outstanding Features in Technique

龙滩水电站设计及技术特点

互联网摘选

4、

Furthermore, a C-language based computer program is developed to carry out the reliability computations using the proposed KCP method.

最后,以锦屏一级水电站左岸边坡稳定可靠度问题为例证明了所提方法的有效性。

互联网摘选

5、

Develops an unsteady mathematical model of ventilation system for the corridor in dam.

摘要以水电站坝体廊道通风系统为研究对象,建立了非稳态数学模型.

互联网摘选

6、

Application of S7-200 PLC to auxiliaries control system reform of Fenghuang Hydropower Station

S7-200PLC在凤凰水电站辅机监控系统改造中的应用

互联网摘选

7、

When completed, the 600-foot-high dam will be the largest hydroelectric project in the world.

工程完工时, 600英尺高的大坝将成为世界上最大的水电站.

互联网摘选

8、

Application of CZY No Uplift Extension Line System in Observation of Hydroelectric Station

CZY无浮托引张线系统在水电站观测上的应用

互联网摘选

9、

Qualified dam core impervious material is produced by controlling four key procedures during material mixing.

大坝心墙防渗掺合料的生产质量是狮泉河水电站大坝质量控制的关键.

互联网摘选

10、

The ZHS over fall big dam is a low dam. The maximum dam height is 39.5m.

昭平水电站溢流坝属低坝,最大坝高395m。

互联网摘选

11、

Summary of the ZHS over-fall big dam design

昭平水电站溢流坝设计综述

互联网摘选

12、

Diversion practice and understanding of the ZHS

昭平水电站导截流实践与认识

互联网摘选

13、

Features of the ZHS ship lock structure

昭平水电站船闸的结构特色

互联网摘选

14、

Operation-management of the big dam and ship lock of the ZHS

昭平水电站大坝、船闸的运行管理

互联网摘选

15、

General layout and the barrier-drift system of the ZHS WR pivotal project

昭平水电站枢纽总体布置及拦排漂系统

互联网摘选

16、

In this paper, two methods were applied to calculate the PMP of the basin between Benzilan and the Hutiao Gorge Dam of the Hutiao Gorge hydro-power station: the combined storm maximization and the local storm maximization.

对虎跳峡水电站奔子栏至虎跳峡坝址区间流域可能最大暴雨计算,采用了当地暴雨放大和组合暴雨放大两种方法。

互联网摘选

17、

Soft foundation displacement by sandy gravel in construction of small-sized hydropower plant

小型水电站软基础砂卵石置换施工

互联网摘选

18、

Construction of the main structure of China's Baihetan Hydropower Station has been completed.

中国白鹤滩水电站的主体结构建设已经完成。

互联网

  • 今日热词
  • 热门搜索

简答网英语词典(dict.jiandongshicai.cn)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:(如需回复请填写联系方式)
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈