Police senior superintendant Yu Tat-chung said the 23-year-old suspect's motives were not clear.

  • 高级警司余达松称,这名23岁的嫌疑人作案意图不清。
  • 来源:互联网摘选更新时间:2025-01-20 12:36:38

  • 重点词汇
  • saidadj.[律]上述的;少说为妙;(做)某事有/没有很多优点(或好处):某事物有/没有多少可说的;说到底;
  • theart.这个;指已提到或易领会到的人或事物;指独一无二的、正常的或不言而喻的人或事物;用以泛指;与形容词连用,指事物或统称的人;用于姓氏的复数形式前,指家庭或夫妇;(指特定用途的事物)足够,恰好;每,一;当前的,本,此;(重读,表示所指的为知名或重要的人或事物)
  • clearadj.易懂的,清楚的;显然的;透明的;明亮的;畅通的;晴朗的;光洁的;无愧的;远离的;
  • motivesn.动机,目的( motive的名词复数 );
  • notadv. (否定后面的词或短语,或作否定的回答)不;(构成动词be、do和have及情态动词can或must等的否定形式,常缩略为n't)没有;否,或许不;(拒绝或不允许)不
  • were be的过去时复数和第二人称单数形式;有时代替 was,用于条件从句、动词 wish 之后等;
  • senioradj.级别/地位高的,资深的;(比赛)成人的,高水平的;
  • yuabbr.Yugoslavia 南斯拉夫;
  • 相关例句
1、

This paper presents the test results of the deformation of the dike, the bending moment and soil resistance of the pile near the dike at different construction and operation periods.

试验给出围堤及码头在施工期和运行期的变形过程,同时给出部分钢管桩受围堤及地基变形影响产生的水平位移、弯矩和土抗力的变化曲线。

互联网摘选

2、

Non-linear finite element analysis of anti-slide pile for flood dike in Changwu county

苍梧县城区防洪堤抗滑桩非线性有限元分析

互联网摘选

3、

The formation mechanism of transition part shoal, function and arrangement of spur dike and training dike are expounded and living examples are given for explanation.

对过渡段浅滩形成的机理,丁、顺坝的作用和布置等方面进行论述,并以整治实例予以说明。

互联网摘选

4、

The percolation: paddy field> earth dike terrace> stone dike terrace> sloping field> woodland.

渗漏量:水田>土坎梯田>石坎梯田>坡地>林地,林地的渗漏量最小;

互联网摘选

5、

The crucial part of overflow earth dike is erosion prevention for flowing surface.

过水土石坝的关键在于溢流面的防冲保护。

互联网摘选

6、

But here you are superintendant.

但是现在你是监督人。

互联网摘选

7、

The results show that these problems can be solved by forming bend circulating current in use of physical features of the river, and taking some engineering measures: build debris barrier, sand diversion drowned dike and training wall.

结果表明:利用有利河势,形成弯道环流,增设拦沙坎,导沙潜堤、束水墙等工程设施,问题是能解决的。

互联网摘选

8、

In the experiment, the overflowing ability of gate, wing wall in the upstream and downstream of gate room, the rationality of plane distribution of diversion dike and protected bond range, and the rationality of distributing facilities for energy dissipation and erosion protection are studied.

试验对闸的过流能力、闸室上下游翼墙、导流堤的平面布置以及闸室上下游护砌范围的合理性、闸下消能防冲设施布置的合理性等进行了研究。

互联网摘选

9、

When the pollution area was relatively large and there was tributary nearby, the diversion dike was used to lead the phenolic pollutants into the tributary which had the small cross-section, so that the activated-carbon-block-adsorption net ( ACBA net) could be set easily.

当酚类污染物污染范围较大,且附近有小河汊等时,利用导流堤将污染物引入横截面较小的小河汊,以便安置活性炭拦截吸附网。

互联网摘选

10、

VOF model was applied to3D numerical simulation and calculation of the dike dam project at the confluence of Daduhe River and Nanyahe River arid its influencing regions.

采用VOF模型对大渡河与楠桠河交汇处的护堤工程区及其影响范围进行了三维数值模拟计算分析。

互联网摘选

11、

Interactive design of the dike dam.

堤坝交互式设计。

互联网摘选

12、

Determining Valid Vertical Space in Observation Hole of Dike dam

大坝观测孔有效铅垂空间的确定

互联网摘选

13、

The Research and Development of the Dike Dam Computer Aided Design System

堤坝计算机辅助设计系统的研究与开发

互联网摘选

14、

According to the reality of the project, 3 main factors affecting the dike safety, i.e. the exploration data, soil properties, and enforcement measures, and a corresponding index system and weighted function for evaluation are determined.

根据工程实际情况,确定了物探资料、土层性质、加固措施3个影响堤防安全的主要因素及相应的评价指标体系和权系数。

互联网摘选

15、

The main disease of the dike include: Seepage, crack, slip, cave, weak layer, collapse, pipe breach.

堤坝的主要病害有:渗漏、裂缝、滑坡、孔洞、软弱层、坍塌崩岸、涵管破裂。

互联网摘选

16、

Design of reinforced earth heightening for main dike of Liao river

辽河干堤加筋土加高设计

互联网摘选

17、

Study on Methods to Prevent Seepage at Huanggang Main Dike on Yangtze River

黄冈长江干堤防渗方法研究

互联网摘选

18、

Permeable pile dike is an important method for stream control in river restoration or construction, and is of some marked advantages including deep groundwork, large strength, simple construction, little emergency, easy maintenance, effective control on the flow trend and increasing the sedimentation.

透水桩坝是河道整治工程中的一种,由于其根基深,强度大,施工程序简便,具有少抢险,易护理,同时具有控导河势和在滩地缓流落淤等功效。

互联网摘选

20、

While serve for beaching of bank, permeable spur dike could elaborate meantime merit sever of discontinuity revetment slacken littoral current velocity, brought accumulation of sediment, touch the object to preserve bank.

当用作护岸工程时,丁坝可以发挥其间断性护岸的优点,减缓近岸流速,促使泥沙淤积,达到保护堤岸的目的。

互联网摘选

  • 今日热词
  • 热门搜索

简答网英语词典(dict.jiandongshicai.cn)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:(如需回复请填写联系方式)
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈